Elegant Comfort in the heart of Paris-Notre Dame | Apartment in Paris

10.0 (27 Reviews) |   1 Bedroom  1 Bathroom  4 Guests
Sorbonne Apartment | Elegant Comfort in the heart of Paris-Notre Dame

1 Bedroom Apartment in Sorbonne, Paris

This magnificent 25 m² apartment offers the perfect balance of modern comfort and Parisian charm. Let yourself be seduced by the art of the French living in this little corner of paradise that can accommodate up to 4 people. It's nestled in the Quartier Latin of Paris, just a few minutes from the emblematic Fontaine Saint-Michel.
Layout: On the 1st floor: (Kitchen(stove, electric kettle, toaster, coffee machine, oven, microwave, fridge, dishes and cutlery, Cooking basics), Living/bed room(Bed Linen, Desk, Internet Access DSL, double sofa bed, air conditioning), bedroom(Wardrobe, double bed, TV), bathroom(shower, washbasin, toilet, hairdryer, Towels/Sheets (Incl.))) Hot Water, First Aid, Play area, washing machine, heating, iron, shampoo, Essentials, Downtown, Long term stays allowed, Room-darkening shades, Town
These costs are mandatory and charged on site. They are not included in the rental price.:
Pets; Not allowed
Bed linen; Present
Optional services that you can arrange on site:
Bath towels; Present
Wifi; Free

Elegant Comfort in the heart of Paris-Notre Dame is located in Sorbonne. Elegant Comfort in the heart of Paris-Notre Dame provides accommodation, featuring Security/Safety, Bedding/Linens, Internet, among other amenities. This Apartment features Security/Safety, Bedding/Linens, Internet, to make your stay a comfortable one.

Elegant Comfort in the heart of Paris-Notre Dame has 1 Bedroom , 1 Bathroom, and max occupancy of 4 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Apartment because of the excellent services rendered by the owner or manager of this Apartment, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Apartment has a friendly neighborhood, and the Sorbonne has interesting places to visit. If you want to learn more about the Apartment in Sorbonne, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Air Conditioner
TV
Security/Safety
Bedding/Linens
Wellness Facilities
Fireplace/Heating
Child Friendly
Internet
Kitchen
Laundry

Facility Overview

Air Conditioner
  • Heating
  • Air conditioning
Bathrooms
  • 1 bathroom
  • Shower
  • Towels provided
  • Hair dryer
Bedroom
  • 1 bedroom
  • Bed sheets provided
Kitchen
  • Toaster
  • Oven
  • Refrigerator
  • Microwave
  • Stovetop
  • Coffee/tea maker
  • Cookware/dishes/utensils
Laundry
  • Laundry facilities
  • Washing machine
Pet Friendly
  • No pets allowed
Accessibility
  • Smoke-free property
Entertainment
  • TV
General
  • Unit size: 280 sq ft (26 sq m)
  • Dutch
  • French
  • English
  • In the city center
Guest Services
  • Iron/ironing board
Internet
  • Internet access
Security/Safety
  • Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
  • Smoke detector installed (host has indicated there is a smoke detector on the property)

Policies

Child Policy
Children are welcome.
Event Policy
Events allowed
Pet Policy
Pets not allowed
Smoking Policy
Smoking is not permitted

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a smoke detector on the property host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip parties and events are allowed on site special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation

Check Apartment Availability
Nightly rates from:
USD $485
You will be redirected to  
Hot Deal - It has been viewed 50 times today
Not the right fit? Check out our other properties in Sorbonne
Property Image From $141
         

Property Image From $135
         

|
9.8 (18 Reviews)
Apartment
  • Balcony/Terrace
  • Child Friendly
  • Internet
Property Image From $272
         

10.0
Apartment
  • 322 ft² Apartment
  • TV
  • Bedding/Linens
  • Fireplace/Heating
Property Image From $385
         

8.0 (5 Reviews)
Apartment
  • Security/Safety
  • Sports/Activities
  • Guest Services
Property Image From $399
         

10.0 (14 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • TV
Property Image From $225
         

|
9.0 (16 Reviews)
Apartment
  • Parking
  • Child Friendly
  • Internet
Property Image From $160
         

9.0 (2 Reviews)
Apartment
  • 322 ft² Apartment
  • Air Conditioner
  • Parking
  • TV
Property Image From $485
         

10.0 (27 Reviews)
Apartment
  • Air Conditioner
  • TV
  • Security/Safety
Property Image From $566
         

|
10.0 (2 Reviews)
Apartment
  • TV
  • Balcony/Terrace
  • Security/Safety
Property Image From $292
         

9.0
Apartment
  • 279 ft² Apartment
  • TV
  • Fireplace/Heating
  • Kitchen
Property Image From $160
         

10.0 (16 Reviews)
Apartment
  • Air Conditioner
  • TV
  • View
Property Image From $232
         

|
10.0 (2 Reviews)
Apartment
  • Security/Safety
  • Child Friendly
Property Image From $928
         

10.0 (4 Reviews)
Apartment
  • Air Conditioner
  • TV
  • Wheelchair Accessible
Property Image From $154
         

|
10.0 (2 Reviews)
Apartment
  • Accessibility
  • Security/Safety
  • Guest Services
Property Image From $504
         

10.0 (3 Reviews)
Apartment
  • TV
  • Security/Safety
  • Bedding/Linens
Property Image From $394
         

|
10.0 (1 Review)
Apartment
  • Security/Safety
  • Sports/Activities
  • Fireplace/Heating
Property Image From $235
         

10.0 (3 Reviews)
Apartment
  • TV
  • Security/Safety
  • Bedding/Linens
Property Image From $351
         

|
10.0 (1 Review)
Apartment
  • Security/Safety
  • Fireplace/Heating
  • Child Friendly
Property Image From $363
         

10.0 (2 Reviews)
Apartment
  • Security/Safety
  • Bedding/Linens
  • Wellness Facilities
Property Image From $227
         

10.0 (1 Review)
Apartment
  • Security/Safety
  • Child Friendly
  • Internet
Property Image From $1,987
         

Property Image From $1,285
         

|
9.8 (5 Reviews)
Apartment
  • Pet Friendly
  • Security/Safety
  • Child Friendly
Property Image From $695
         

10.0 (1 Review)
Apartment
  • Air Conditioner
  • TV
  • Wheelchair Accessible